Back to search result
Brandangersundet bridge
Additional information
The main span is constructed as a networkbridge with a steel construction girder. The concrete pavement is fitted by the help of cantilevered cables. The main span were produced at Sløvåg (further down the coast), and freighted over sea by two barge cranes to the place for installation.