Flood protection facility for Młynówka, Opole

  • Flood protection facility for Młynówka, Opole
  • Flood protection facility for Młynówka, Opole
  • Flood protection facility for Młynówka, Opole

The project ensured complex flood protection for Opole. The contract works included rebuilding of the river bed and inter-levee strip - 3 km in length We have also modernized additional hydraulic engineering installations. The works included installation of two bulkheads in Młynówka river and pumping out the water in order to clean the river bottom and conduct archeological research. As the heavy building equipment could not pass through narrow streets of the old town, we have used vessels and combined land and water transport. Some of the hydraulic engineering installations (e.g. weir) were built in late 19th and early 20th century. We have tried to restore them to their original condition. The water flowing through the installation is backlit, which makes the entire facility very attractive.

Contacts

Iwona Walczak
Koordynator

Facts

Service: Construction
Mark segment: Water transport
Start date: 2004
Completion date: 2007
Clients: Regionalny Zarząd Gospodarki Wodnej we Wrocławiu
Country: Poland
City: Opole
Project status: Completed