Back to search result
Extension of road infrastructure for new investments in the area of Elblag
Constructing the project
Scope of works realized:
- embankments: 178 872,4 m3
- excavations: 126 910,0 m3
- bitumen mass : 20 625 tons
- surface of road lanes: 35 870m2
- surface of walkways and bicycle paths: 21 140 m2