Combined Heat & Power Plant (CHP) System
$95 million replacement and expansion of an existing co-generation plant with a new 13.4 megawatt (MW) facility consisting of two gas turbine generators with boiler units (heat recovery steam generators) and switchgear within an underground vault. The new facility feeds 11 substations, increasing electric service from 7 to 20 campus buildings and maintaining high temperature hot water service to 40 campus buildings. Phases included utility relocations, such as 20-inch and 30-inch gas lines, water mains, sewer and existing electric vaults; vault construction; vault fit-out, electrical distribution and fuel tank modification.
Facts
Service: Construction
Mark segment: Higher education, Water management
Start date: 2007
Completion date: 2010
Clients: New York University
Country: United States
City: New York
Contract value: 116.7 M USD
Project status: Completed