Back to search result
Extention of the provincial road no 307 Poznan - Zakrzewo
Additional information
Project in figures:
In total:
- Earthworks – 200 000 qubic meters
- Concrete substructure – 28 000 qubic meters
- Substructure of the stone crushed aggregate – 50 000 tons
- bituminous surface – 60 000 tons
- stone and concrete paving surface – 35 000 square meters
- barriers 5000 meters, including 3700 meters of cable barrier used for the first time in Wielkopolska region, well known in the A1 motorway built by Skanska
- kerbs 22 000 meters