Search

Back to search result

Extention of the provincial road no 307 Poznan - Zakrzewo

Additional information

Project in figures:

In total:

-          Earthworks – 200 000 qubic meters

-          Concrete substructure – 28 000 qubic meters

-          Substructure of the stone crushed aggregate – 50 000 tons

-          bituminous surface – 60 000 tons

-          stone and concrete paving surface – 35 000 square meters

-          barriers 5000 meters, including 3700 meters of cable barrier used for the first time in Wielkopolska region, well known in the A1 motorway built by Skanska

-          kerbs 22 000 meters