Intercity Road
Constructing the project
Our scope of works included construction of new intercity road “Zachód" R1 and R2 in Ruda Śląska. We built a GP class road (main fast traffic road) with two roadways, three lanes each and emergency lanes. Along the roadways separated by green belt we installed noise barriers to protect the neighborhood households. The road is connected to Ruda Śląska road system by two-level junction. The works also included: Rebuilding of sanitary system, rainwater drainage system, heating system, gas installation, power and telecom installations, water supply system as well as tramway and railway lines.
The project in figures
• 3.2 two roadway main road
• 6 bridges
• 4 overpasses
• 1 railway overpass
• 1 two-level junction (“diamond”)